The project provides a 24 Bed Med Surg build-out that encompasses 14,700 SF on the 2nd Floor of the existing building. 50% of the 24 Med Surg rooms will be equipped with patient lifts.
Owner: Kaiser Permanente
Architect: Hibser Yamauchi Architects
GC: XL Construction
Framer: Coffey
Our Scope: 3D modeling, coordination and clash detection of the Metal Stud Framing.